Baylor Football Stadium

Location of Project

Waco, TX

Project Contractor:

Austin Commercial

Project Budget:

$100-$250K

High bay, monumental motorized MechoSystems roller shades installed in the dining and event area of the stadium. The shades were 10′ x 24′ and were installed at 34′ above finished floor. SOL Shades also installed other manual and motorized shades in various parts of the stadium. SOL Shading Solutions worked extensively with the General Contractor to ensure the project would be turned over on the scheduled completion day with 100% control of the various zones the owner required.

High bay, monumental motorized MechoSystems roller shades installed in the dining and event area of the stadium. The shades were 10′ x 24′ and were installed at 34′ above finished floor. SOL Shades also installed other manual and motorized shades in various parts of the stadium. SOL Shading Solutions worked extensively with the General Contractor to ensure the project would be turned over on the scheduled completion day with 100% control of the various zones the owner required.

Category: